セメント杭用太陽光発電杭打機 48-52トン HITACHI 掘削機

太陽光発電用杭
August 29, 2025
Category Connection: 光伏パイルドライバー
Brief: Discover the Photovoltaic Pile Driver for Cement Piles, designed for 48-52 Ton HITACHI Excavators. This robust tool features a 750 Kg arm and 3500 Kg hammer, ensuring precision and power for driving piles up to 12 meters. Perfect for solar farms and infrastructure projects, it comes with a 1-year warranty for reliable performance.
Related Product Features:
  • Equipped with a 750 Kg arm for stability and precision during operation.
  • Compatible with 48-52ton excavators for seamless integration.
  • Features a 3500 Kg hammer for powerful impact force.
  • Capable of driving piles up to 12 meters in length efficiently.
  • Includes a 1-year warranty for reliable performance and support.
  • Ideal for solar farms, building foundations, and infrastructure projects.
  • Reduces installation time and effort, boosting productivity.
  • Combines innovation with sustainability for renewable energy projects.
FAQ:
  • What is the maximum pile length the Photovoltaic Pile Driver can handle?
    The Photovoltaic Pile Driver can efficiently drive piles up to 12 meters in length.
  • Is the Photovoltaic Pile Driver compatible with other excavator models?
    This Pile Driver is specifically designed for 48-52ton excavators, ensuring optimal performance and integration.
  • What warranty is provided with the Photovoltaic Pile Driver?
    The Photovoltaic Pile Driver comes with a comprehensive 1-year warranty, ensuring reliable performance and support for your projects.
関連動画

VIBRA Installation and performance on the site

その他のビデオ
September 30, 2020

VIBRA FV model large pile length

その他のビデオ
January 05, 2021

側面のグリップの杭打ち機

SV サイドグリップ・ピール・ドライバー
September 25, 2025

サイドグリップ ビブロハンマー

SV サイドグリップ・ピール・ドライバー
April 14, 2025

Solar pile driving from working site

その他のビデオ
April 25, 2022

VIBRA in Different Color

その他のビデオ
December 15, 2020