VIBRA in different construction site

その他のビデオ
September 30, 2020
Category Connection: 機械ブーム
Brief: Discover the VIBRA in action across various construction sites with our Anti Breaking Mechanical Boom. This high-durability, compact, and strong structure is designed for heavy-duty performance. Learn about its big arm customization, technical parameters, and how it enhances efficiency in infrastructure projects.
Related Product Features:
  • High strength steel welding prevents bending and breaking for enhanced durability.
  • Thicker alloy cover on connecting axle ensures wear resistance and longer lifespan.
  • Hydraulic pipe layout matches excavator arrangement for seamless integration.
  • Argon-arc welded joint-points provide superior strength and reliability.
  • Same lubrication system as excavator for easy maintenance and extended life.
  • Customizable big arm lengths (9.0m, 10.5m, 12.5m) to suit different project needs.
  • Compatible with excavators ranging from 30-60 tons for versatile applications.
  • Total weights from 4200kg to 6500kg ensure stability and performance.
FAQ:
  • What materials are used in the Anti Breaking Mechanical Boom to ensure durability?
    The boom uses high strength steel for welding to prevent bending and breaking, along with a thicker alloy cover on the connecting axle for wear resistance and a longer lifespan.
  • How does the hydraulic pipe layout benefit the excavator?
    The hydraulic pipe layout is designed to match the excavator's arrangement, ensuring seamless integration and optimal performance. All joint-points are argon-arc welded for added strength.
  • What are the available models and their specifications?
    The Anti Breaking Mechanical Boom comes in three models: CB-12 (9.0m big arm, 3.8m small arm, 12m max pile length), CB-15 (10.5m big arm, 4.5m small arm, 15m max pile length), and CB-18 (12.5m big arm, 5.5m small arm, 18m max pile length).
関連動画

VIBRA Installation and performance on the site

その他のビデオ
September 30, 2020

VIBRA FV model large pile length

その他のビデオ
January 05, 2021

側面のグリップの杭打ち機

SV サイドグリップ・ピール・ドライバー
September 25, 2025

サイドグリップ ビブロハンマー

SV サイドグリップ・ピール・ドライバー
April 14, 2025

Solar pile driving from working site

その他のビデオ
April 25, 2022

VIBRA in Different Color

その他のビデオ
December 15, 2020